Contact us
Our vision
Solutions
Where we are
News
E-mail
The order of supply is in strict order of vessel’s arrival.
In general, there is a minimum quantity of 100mt to supply.
No, we supply within the port limits.
Yes, in order to guarantee product quality minimum quantity required is 75mt for intermediate fuels.
By pipeline, only Ceuta port has draft limit of 12 meters and maximum vessel’s LOA 150m.
By barge, Minimum vessel’s LOA required to supply by barge is 120meters.
There is no minimum quantity required.
Truck nominations should take place at least two labor days ahead of vessel’s arrival.
In case of a private yacht enquiry, whom should I talk to?
Please send your quote to the following email address marina@cepsa.com.